Bullet does not change in order to keep the previous symbol

Asked By 0 points N/A Posted on -
qa-featured

I want to create a text box in default format with bullets and other symbols that includes to the bullets. This is a simple thing. But whenever I tab (shift+alt+arrow) in the levels the symbol of bullet does not change in order to keeping the previous symbol. I tried to create that text box with right font and size and any other thing.

How can I do this ?

SHARE
Answered By 0 points N/A #96315

Bullet does not change in order to keep the previous symbol

qa-featured

 

In Microsoft PowerPoint? So you can’t control the bullets? Do the following:
 
In Microsoft PowerPoint, open a new blank PowerPoint slide. Type any text in a text box (anything you want), then select or highlight one sentence, choose “Bullets and numbering” under Format. Next, you will see that you can change the appearance of a bullet point. 
 
In controlling the level of bullet points. You can select the text, press shift+alt+right arrow to move the level. Pressing it again will move it to the next level. If you want to bring back the level, just press shift+alt+left arrow key (you can press it until it reaches the indent that you want). Hope this helps.
 

Login/Register to Answer

Related Questions