Questions Solved
Whats the cost of a 3-D Printer for home use?
I am amazed with the things the 3-D printer can do now a days. Can i know the cost/Brands/Best places to buy/Softwares used etc
- 603 views
- 2 answers
- 0 votes
I am an administrator, I was either asked to elevate or ran the installer “as administrator” myself, but still getting this error. I am trying to resolve this error using some online resolutions but could not fix this. I am using Windows XP Operating System so need your assistance as soon as possible. Thanks for this.
TortoisesSVN 1.7.6.22632(64bit) Setup
Installing tortoisesSVN 1.7.6.22632(64bit) Setup
- 1600 views
- 2 answers
- 0 votes
Hello,
Why I can't install VMware-player-3.0.1-227600 on my laptop?
Here is the image. Any solution for this? Any help would be greatly appreciated. Thanks for help.
Background Color
Corel PHOTO-PAINT X5
Out of memory
VMware-Player-3.0.1-227600
Error UI Timed out
- 2156 views
- 3 answers
- 0 votes
Hello,
What is the reason for the error message as I am using Windows XP Operating System? I am also unable to understand this issue so I need your assistance to fix this issue. Any help would be greatly appreciated. Thanks for help.
Npdsplay
Cannot Create Direct show Player
- 831 views
- 2 answers
- 0 votes
Hello,
And the path clearly shown along with the error message but I am unable to resolve this issue. I am running Windows 7 Operating System and I need your help to demolish this problem. I have tried many times to fix this issue but can’t fix this issue. How can I fix this problem? Provide any solution. Thanks in advance.
Windows cannot access the specified device path, or file. You may not have the appropriate permissions to access the item.
- 989 views
- 2 answers
- 0 votes
Hi,
I am a parent and I want to know how to ensure that my kid is protected even when she is online. Can I block some sites for her? Even after that, what other measures can I implement? How can I be sure she is safe from predators?
- 580 views
- 3 answers
- 0 votes
Hello,
However, when I clicked the Check for updates, I got this error message now I am trying to resolve this issue but I can’t do this without your help. I need your assistance so that I may not face this problem. Please provide a solution with some easy steps. Thanks in advance.
Malwarebytes’ Anti-Malware
An error occurred. Please the following error code to the Malwarebytes’ Anti Malware support term.
Error code 732(0, 0)
- 637 views
- 2 answers
- 0 votes
Hi,
I occasionally print my lectures, assignments etc but this is once in a while. I noticed that the cartridges run out quickly. Let’s say much quicker that they opt to be. Is there a way I can preserve the cartridges to last longer keeping in mind that I am an infrequent user?
- 633 views
- 2 answers
- 0 votes
Hello,
After restarting Windows the "umbrella is closed" – the AntiVir Guard and the Firewall don't work. After pressing the "start service" button next to Firewall I get a message that it can't be started. I tried many times to resolve this matter but I can’t fix this issue. How can I resolve this issue? Any suggestion would be helpful. Thanks.
- 679 views
- 2 answers
- 0 votes
Hello, Today with a co-worker we were working on sequencing Project 2010 and at some point during the installation we’ve got the following error message. I am trying to resolve this issue but I am unable to fix it. Help me with proper solutions.
Thanks.
Microsoft Project Standard 2010: Installation Progress Setup Error 1920.Service ‘Office Software Protection Platform’(osppsvc)failed to start. Verify that you have sufficient privileges to start system services.
- 828 views
- 3 answers
- 0 votes